6th Form Block – Warriner School, Bloxham

Client: Warriner School
Consultants: Valley Building and Construction Services Ltd
Cost: £0.6M
Type: 6th form block – Braced steel portal frame structure
Status: Complete

The structure was created using a braced steel portal frame in order to maximise the clear spans and create a flexible use space. Created on a concrete pad foundations with reinforced ground bearing slab.
The structural remit also included for secondary steelwork, and eaves detailing and structural landscaping works.

Contact Us

Back to commercial projects